Circle Line 6 - Closing the Loop

Circle Line 6 - Closing the Loop 6
Circle Line 6 - Closing the Loop 7

Source: https://www.lta.gov.sg/content/ltagov/en/upcoming_projects/rail_expansion/circle_line_6.html

Avenue South Residence

Circle Line 6 Closing the Loop System of Circle Line 6 Look forward to even more direct routes to the Central Business District, Marina Bay and the HarbourFront area. The Circle Line 6 (CCL6) extension will add three stations between HarbourFront and Marina Bay MRT stations, closing the loop for CCL. The stations are: Keppel, Cantonment and Prince Edward Road. The complete CCL will link to all or any existing train lines and shorten travel time, while also giving commuters more alternative routes that bypass the busy interchanges at City Hall and Raffles Place. This will bring the total amount of CCL stations to 33, including 12 interchange stations that hook up to other MRT Lines. Latest Updates The alignment of the Circle Line 6 (CCL6) was announced in October 2015 and construction works for the three final stations in the southern part of Singapore commenced in April 2018 with the installing earth retaining walls and stabilising structures for the station boxes, depot and tunnels is progressing smoothly. Thereafter, excavation works are expected to commence in mid-2019. In May 2017, public was invited to submit suggestions for the naming of the six CCL stations. About 1,950 participants subsequently voted in a public polling exercise. The finalised station names are “Keppel”, “Cantonment” and “Prince Edward Road&rdquo ;.Location of Stations Keppel MRT station footprint Keppel Cantonment MRT station footprint Cantonment Prince Edward MRT station footprint Prince Edward Road Key Facts No. of stations icon Quantity of stations 3 Amount of rail line icon Period of line 4km Expected project completion icon Expected completion 2025 A complete of 11 new Circle Line trains will soon be put into cater for additional convenience of the CCL6 operations in 2025. This increases the existing CCL fleet by 17 per cent from 64 to 75 trains. Manufactured and assembled in Spain, the new trains could have these features: Condition Monitoring System where the system gathers data from equipment on the trains, allow continuous monitoring of the fitness of the equipment and for predictive maintenance for the trains; Automatic Track Inspection (AIT) System where the machine enables monitoring of the running rails, track equipment and sleepers, identifies components that need maintenance and supplements existing track inspection activities; Current Collector Shoe Dislodgement Detection where current collector shoes will be designed with sensors allow the operator to react promptly and take necessary measures if any dislodgement is detected. Did You Know? Did you know icon CCL6 will be built in areas which are fairly dense and near heritage sites. Therefore, special efforts are now being made to make sure that the works do not affect buildings with historical and architectural significance. Cantonment MRT station has been sensitively integrated with the old Tanjong Pagar Railway Station (which is gazetted as a national monument). To facilitate construction, several elements of the former railway station’s train platforms is likely to be removed. LTA and the Urban Redevelopment Authority are seeking advice from the heritage consultant and members of the heritage community on possible solutions for the affected platforms. To cater for future needs, Kim Chuan Depot will undoubtedly be expanded to almost double its capacity from 70 to 133 trains. The integrated depot will house 550 buses, that will allow us to optimise land use. The depot is going to be completed at the same time frame as CCL6 in 2025. News Releases Fact Sheet: Circle Line 6 Construction to get into Full Swing Joint release by the LTA & Singapore Land Authority – Circle Line 6 – becoming a full circle Land Transport Authority

Book An Appointment to view Avenue South Residence ShowFlat & get VVIP Discounts (Limited Time), Direct Developer Price, & Hardcopy E-Brochure. Guaranteed with Best Price Possible.

OR

Fill up the form on the right and get a copy of Avenue South Residence Price, E-Brochure, and Latest Updates!

 Strictly no spam policy.

    (You may select more than one unit type)
  • This field is for validation purposes and should be left unchanged.
error:
+ +
Chat Now!
1
Welcome to Avenue South Residence 南峰雅苑 !
Hello! Thank you for visiting
🎖Avenue South Residence 南峰雅苑🎖

We Are OPEN For Viewing From 19th June Via Appointment.

👉🏻 12 Units Sold On Oct 2020 Itself & Moving Fast!!

🌟STARBUY UNITS🌟
For PEAK Collection🏙️
💫Level 37 to Level 56💫

❣️Where To Get A SeaView From $2017psf at District 03?!❣️

🔎1 Bedrm 527sqft (Sea View)
fm $1,267,000 $2,404psf

🔎2 Bedrm 657sqft (Sea View)
fm $1,555,000 $2,366psf

🔎3 Bedrm 1109sqft (Sea View)
fm $2,237,000 $2017psf

🔎4 Bedrm 1496sqft (Sea View)
fm $3,187,000 $2130psf


✨ Attractive Entry Price much lower than nearby new launches.

🌇 Greater Southern Waterfront, 2,000 hectare, 6 times the size of Marina Bay!

❤Tap on the potential of the Greater Southern Waterfront❤

🏙 Newest Iconic 56-Storey

🏞 2 Upcoming MRT stations near CBD.

🎇 24km Rail Corridor

📈 First Mover Advantage

Physical Viewing is Strictly by Appointment Only to avoid overcrowding. Limited slots per day.

Zoom Virtual Viewing is available.
Chat with us Now to find out more!
Powered by