Circle Line 6 - Closing the Loop

Circle Line 6 - Closing the Loop 6
Circle Line 6 - Closing the Loop 7

Source: https://www.lta.gov.sg/content/ltagov/en/upcoming_projects/rail_expansion/circle_line_6.html

Avenue South Residence

Circle Line 6 Closing the Loop System of Circle Line 6 Enjoy a lot more direct routes to the Central Business District, Marina Bay and the HarbourFront area. The Circle Line 6 (CCL6) extension will add three stations between HarbourFront and Marina Bay MRT stations, closing the loop for CCL. The stations are: Keppel, Cantonment and Prince Edward Road. The entire CCL will link to any or all existing train lines and shorten travel time, while also giving commuters more alternative routes that bypass the busy interchanges at City Hall and Raffles Place. This will take the total number of CCL stations to 33, including 12 interchange stations that connect with other MRT Lines. Latest Updates The alignment of the Circle Line 6 (CCL6) was announced in October 2015 and construction works for the three final stations in the southern element of Singapore commenced in April 2018 with the installing earth retaining walls and stabilising structures for the station boxes, depot and tunnels is progressing smoothly. Thereafter, excavation works are anticipated to commence in mid-2019. In May 2017, public was invited to submit ideas for the naming of the six CCL stations. About 1,950 participants subsequently voted in a public polling exercise. The finalised station names are “Keppel”, “Cantonment” and “Prince Edward Road&rdquo ;.Location of Stations Keppel MRT station footprint Keppel Cantonment MRT station footprint Cantonment Prince Edward MRT station footprint Prince Edward Road Key Facts No. of stations icon Quantity of stations 3 Length of rail line icon Amount of line 4km Expected project completion icon Expected completion 2025 A complete of 11 new Circle Line trains will undoubtedly be put into cater for extra convenience of the CCL6 operations in 2025. This increases the present CCL fleet by 17 per cent from 64 to 75 trains. Manufactured and assembled in Spain, the newest trains could have the next features: Condition Monitoring System where the system gathers data from equipment on the trains, to enable continuous monitoring of the healthiness of the equipment and for predictive maintenance for the trains; Automatic Track Inspection (AIT) System where the device enables monitoring of the running rails, track equipment and sleepers, identifies components that require maintenance and supplements existing track inspection activities; Current Collector Shoe Dislodgement Detection where current collector shoes will be designed with sensors to enable the operator to react promptly and take necessary measures if any dislodgement is detected. Did You Know? Did you understand icon CCL6 will undoubtedly be integrated areas which can be fairly dense and near heritage sites. Therefore, special efforts are being made to ensure the works don’t affect buildings with historical and architectural significance. Cantonment MRT station has been sensitively integrated with the old Tanjong Pagar Railway Station (which is gazetted as a national monument). To facilitate construction, several elements of the former railway station’s train platforms will soon be removed. LTA and the Urban Redevelopment Authority are seeking advice from a heritage consultant and members of the heritage community on possible solutions for the affected platforms. To cater for future needs, Kim Chuan Depot is going to be expanded to almost double its capacity from 70 to 133 trains. The integrated depot will house 550 buses, that’ll allow us to optimise land use. The depot will undoubtedly be completed at the same time frame as CCL6 in 2025. News Releases Fact Sheet: Circle Line 6 Construction to go into Full Swing Joint release by the LTA & Singapore Land Authority – Circle Line 6 – becoming a full circle Land Transport Authority

Book An Appointment to view Avenue South Residence ShowFlat & get VVIP Discounts (Limited Time), Direct Developer Price, & Hardcopy E-Brochure. Guaranteed with Best Price Possible.

OR

Fill up the form on the right and get a copy of Avenue South Residence Price, E-Brochure, and Latest Updates!

 Strictly no spam policy.

    (You may select more than one unit type)
  • This field is for validation purposes and should be left unchanged.
error:
OPEN For Viewing Via Appointment ONLY.
+ +
Chat Now!
1
Welcome to Avenue South Residence 南峰雅苑 !
Hello! Thank you for visiting
🎖️Avenue South Residence 南峰雅苑🎖️

Your home at the doorstep of Greater Southern Waterfront & Rail Corridor!! 🌊🌊🌊

🌟ONE PRICE PROMO Breakdown 🌟
📣 Buy Higher Floor at SAME PRICE!
For PEAK Collection STAR-BUY Units

🌊SEA VIEW🌊
🎉 1️⃣ Bedroom 527sqft
💫#37-29 to #42-29
Same Price $1,267,000

💫#43-29 to #47-29
Same Price $1,277,000

🎉2️⃣ Bedroom 657sqft
💫#40-28 to #42-28
Same Price $1,561,000

💫#43-28 to #48-28
Same Price $1,573,000

🎉2️⃣ Bedroom Premium 721sqft
💫#38-30 to #42-30
Same Price $1,693,000

💫#43-30, #47-30 & #48-30
Same Price $1,705,000

🎉3️⃣ Bedroom Premium 1109sqft
💫#37-41 to #40-41
Same Price $2,394,000

💫#43-41 to #48-41
Same Price $2,409,000

🏙️CITY VIEW🏙️
🎉 1️⃣Bedroom 527sqft
💫#37-44 to #42-44
Same Price$ 1,180,000

💫#43-44 to #48-44
Same Price $1,190,000

🎉2️⃣ Bedroom 657sqft
💫#37-33 to #42-33
Same Price $1,458,000

💫#43-33 to #48-33
Same Price $1,470,000

🎉2️⃣ Bedroom Premium 732sqft
💫#37-32 to #42-32
Same Price $1,610,000

💫#43-32 to #48-32
Same Price $1,622,000

🎉3️⃣ Bedroom 947sqft
💫#37-36 to #42-36
Same Price $2,043,000

💫#43-36 to #48-36
Same Price $2,058,000


✨ Attractive Entry Price much lower than nearby new launches.

🌇 Greater Southern Waterfront, 2,000 hectare, 6 times the size of Marina Bay!

❤Tap on the potential of the Greater Southern Waterfront❤

🏙 Newest Iconic 56-Storey

🏞 2 Upcoming MRT stations near CBD.

🎇 24km Rail Corridor

📈 First Mover Advantage

Physical Viewing is Strictly by Appointment Only to avoid overcrowding. Limited slots per day.

Zoom Virtual Viewing is available.
Chat with us Now to find out more!
Powered by